Installation of a 1,200 mm diameter collector
Length of 540 m completed in a single drive
Grade of 0.25%
Depth of ± 7 m below the pavement
The choice of a trenchless technology is primarily based on the in-situ soil conditions. Therefore, an exhaustive geotechnical campaign was conducted for this project.
The applicability of potential trenchless techniques was evaluated based on the required installation precision, soil settlement, the size of the work areas, execution speed, project cost, and the risks associated with the microtunneling technique.
The design calculations were performed specifically for the microtunneling technique according to industry standards.
Winner of the 17th edition of the Quebec Consulting Engineering Awards. The project was presented by our partner Axor.
Finalist for the recognition of an innovative regional project by the Order of Engineers of Quebec.